Under Construction -- New Wing coming 2019

Waksman Addition on cosciamoos.com

We are under construction. The Waksman Institute is adding a three-story addition designed by Coscia Moos Architecture. The 1100 sq. ft addition extends the existing New Wing. Each of the three floors has state of the art, open-concept, laboratory and support space. Each level of the addition will be connected by interior hallways back to the full support spaces of the overall Waksman complex. Opening Spring 2019.